The Process

1

Utilize our Cost Estimator to select a design style, add  sink, integral backplash, and custom cut outs. You can add comments and questions, and request a final formal quote.

You can also send your drawings or prints to [email protected]

2

A detailed quote will then be emailed, faxed or mailed to you for your review. We will include all packaging and shipping to your location.

3

 After a 50% deposit is placed our engineering department will create and email you a set of drawings for your approval.

4

The Manufacturing time for stainless counter tops and sinks is typically averages 4-5 weeks after drawing approval.

We will always work with you to meet your scheduling requirements. Our manufacturing lead time varies depending on the shop load at the time when drawings are approved.

5

We will contact you when your order is packaged and ready to ship.  Please note that the final balance on your order is due prior to shipping.